Category
Construction (Commercial) » Best Use of Timber
Year
2009
Company
Arcon Australia (NSW) Pty Ltd
Project
Clovellly Hotel
Prize
Winner

All of the timber used in this refurbishment project is recycled brush box, most of the timber came from an old timber bridge in Queensland.  When the timber arrived it was in such poor condition that it had to be filled with epoxy before it could be machined.  The extent of the timber work includes three sets of stairs with newel posts and handrails, the face of the bar and bar top, windows, doors, window ledges and wall panelling.  Depending on the area the timber is finished in either polyurethane, natural oil or stained.
The finished timber work is most impressive.
 

Photo gallery

Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd
Arcon Australia (NSW) Pty Ltd