The client brief was to totally strip out the current apartment and do a complete renovation including all new services, plumbing, kitchen, bathrooms, acoustic treatment to walls and floors and a smart lighting system. The judges said the design and construction was of a very high standard which is reflected in the selection of finishes, joinery and standard of workmanship. Access was very difficult with 90% of materials having to be brought up in the lift as well as limited working space requiring very precise programming and coordination. The judges noted that, as always, home unit renovations are never easy, with the builder having to be mindful of all the existing owners before demolition commences. The requirements of this client were for a four week construction period, requiring meticulous preparation and the job was completed on time. Well done indeed.