Category
Construction (Commercial) » Health Buildings
Price
$2,500,001 - $5,000,000
Year
2015
Company
Erilyan Pty Ltd
Project
Port Macquarie Private Hospital Rehabilitation
Prize
Winner

Erilyan was required to reroute the main hospital entry and realign the loading dock driveway before constructing the hydrotherapy pool and a 10-bed rehabilitation ward. This resulted in numerous services relocations including high-voltage lines that fed the hospital substation. A complication was the connection into the existing rehabilitation unit including the gymnasium refurbishment.
The pool area utilised a timber-frame LVL roof structure, CSR ceiling and Dulux Enviropoxy paint to ensure water tightness.
Close co-operation was required between Erilyan and the hospital. As the hospital was in a koala habitat area, two koala habitat trees replaced each tree removed during the works.
Erilyan has achieved a high quality of finish, none more so than in the pool area.

 

Photo gallery

ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD
ERILYAN PTY LTD