A complicated sequence of work was needed to construct this 149 bed, two level Aged Care Facility.
An older, smaller facility (at a reduced capacity) was operating on the site and had to be maintained, requiring the construction to be completed in 2 stages.
Additionally, the ground conditions were very poor, the entire area an overland flood plain with an over layer of contaminated waste material. This material had to be removed and logged according to EPA requirements, then a geofabric layer installed prior to structural commencement. The building was ultimately supported on 20-25 metre deep screw piles.
During construction to minimize covid risk the client introduced a system for access protocols called Smartek which required all subcontractors and personnel to pre-register before entering the site.
Despite these complications the project has been completed to a very high standard, whilst maintaining a close working relationship with the client and with the staff of the continuously operating facility on site.
Category
Construction (Commercial) » Aged Care Buildings
Price
$30 Million - $50 Million
Year
2022
Company
Stephen Edwards Constructions
Project
Narrabeen Glades
Suburb
Warriewood
Prize
Winner