Search MBA
Nordarcon…
The young builder took on a project that was difficult from an engineering aspect. The original architectural design of the 1970’s house had to be respected, and this was achieved...
Read More
Pin Point…
Good value, well finished and with site difficulties. The builder overcame major sewer and heritage concerns.
Read More…
Great use of recycled bricks. The builder’s workmanship was very detailed and complementary to the architectural character required by the client.
Read More…
High finishes with large format tiling posed great difficulties when it came to the internal resilient finishes. The best part of this project was the fact that the old heritage...
Read More
Studio…
A blend of the old house and the new modern extension, FC work at the rear looked like concrete. The judges were impressed with the remediation of the composite precast...
Read More
Reconn…
Difficult site conditions were solved without the use of a crane. There was significant structural work to be completed, in conjunction with good finishes and detailed interiors.
Read More
City…
Exceptional off-form concrete finishes to walls and ceilings. The set out was very precise and near perfect.
Read More
Home…
The additions were complementary to the original house. What impressed the judges was the value for money, the extent of the work and the high level of finishes.
Read More
Bailey…
The project was heavily influenced by the use of recycled timber in all aspects, featuring internal finishes and structural components.
Read More
B-MAC…
The project was well built, with the style of this house similar to the Hampton style. The level of detail and finishes were consistent throughout.
Read More