Joss… The project is located on a prominent green field site near the entry to the campus; it is a two storey building with a structural steel canopy over the concrete...
Read More
… The University of Sydney Faculty of Law is a landmark project and the largest single capital development ever undertaken by the University. The project consists of two levels of basement...
Read More
Watpac… This project on an active school site involved three separable portions which were progressively handed over during the 36 week construction period. The main section of the works was the...
Read More
St… The Rouse Hill High School is built on a greenfield site overlooking the Rouse Hill Regional Centre. The 9,700 metre school has 1,020 students and the new buildings house, administration...
Read More
Marc… This was a most difficult project to construct, because of the limited construction access and the need to maintain student accessibility to all parts of the school. The works required...
Read More
Taylor… This new high school project consists of three buildings linked by covered walkways. The buildings house, art rooms, design & technology rooms and a resource learning centre with wireless LAN...
Read More
Hooker… The MLC Burwood Junior School Is a three storey concrete structure with a structural steel framed metal roof. A glazed façade makes up the majority of the external walls and...
Read More
Kane… The new facility incorporates new and existing buildings into a state of the art multi level Library, multi function centre and School of Arts Community centre with floor space of...
Read More
WBHO… Located on Crown Street at Surry Hills, the centre is a (4) four level building comprising a two level Library, Community Centre, with large function rooms, teaching commercial kitchen, computer...
Read More
Abigroup… The $64 million dollar project is located adjacent to the Sydney international airport terminal on the original on grade car park, (which remained operational during the construction period) with the...
Read More