Tuffy… The judges said this type of building work presented extreme challenges due to site access restrictions in conjunction with specific geotechnical constraints. The three level addition also comprises a new...
Read More
Cape Cod… This 1950s two bedroom home required an addition to satisfy the client’s brief for a home comprising four bedrooms, a study, two bathrooms and large separate formal living area along...
Read More
H.W.… The original single level house was outdated and did not have the open plan living spaces desired by the client. The brief was to remove the existing pergola to build...
Read More
CMS… The client brief was to totally strip out the ground floor of a rundown home and completely renovate the existing structure as well as construct a first floor addition and...
Read More
Beebo… This project involved a major restoration of a heritage listed stone house, with materials used having to be sympathetic to the original building, with examples including reclaimed cobblestones shipped in...
Read More
MATTAH… A traditional two level Victorian corner terrace has become a three level home with multiple light filled living areas. All care was taken to maintain the original style of the...
Read More
Peter… The brief for this project was to reinvent a traditional Federation home to provide a retiring couple with comfortable living and entertaining spaces, bedrooms for grandchildren and a modern light...
Read More
Yuncken… The judges said this project was excellent in many respects, with the standout the exceptional off-form concrete used as a primary structural and architectural element throughout. All detail work was...
Read More
Elliott… The first stage of this project was to demolish the existing residence followed by the diversion of the sewer on a block in the highly developed suburb of Cremorne. There...
Read More
Tori… The workmanship was that of a Master Builder and a worthy winner from a group of entries that were exceptional.
Read More