Search MBA
Mainbrace…
This project was complicated by the existing shopping facility and remainder of the store continuing to operate throughout the entire fitout. The works were extensive and featured supply and installation...
Read More
Hines…
The Cranbrook School Wolgan Valley Campus is located on 96 acres, approximately 40km from Lithgow. The site is nestled in the amazing surrounds of the Wolgan Valley. This stage consists...
Read More
Stephen…
The existing King’s School 1960s building was run down and not in keeping with the school’s recently refurbished boarding houses. This building was fully gutted, leaving minimal external walls in...
Read More
Mainbrace…
The Narellan Town Centre redevelopment is a major extension of the existing shopping centre, more than doubling the gross floor area to 132,810sqm. The existing centre in the south was...
Read More
Fugen…
The Mt Druitt Hospital project consisted of a number of stages across different areas of the hospital. The program required the Pre-Admissions Clinic, L2 MRI extension, L2 Recovery extensions and...
Read More
Erilyan…
This project comprised an extension to the existing hospital to create a new mental health wing of 52 private patient rooms (all with ensuites), staff offices and associated rooms. The...
Read More
Richard…
The Northside Clinic in St Leonards is a private mental health facility owned by Ramsay Health Care. This state-of-the-art facility was designed and built in line with the latest thinking...
Read More
Multiplex…
The St George Hospital Stage 2 Redevelopment involved the construction of a new seven- level Acute Services building on top of an existing operational 24-hour Emergency Department. The facility includes...
Read More
Richard…
Leichhardt Green is a 10,090m2 mixed-use residential design and construct project built on an old industrial site surrounded by narrow streets. The builder undertook site remediation due to high vapour...
Read More