Search MBA
Lipman…
Lipman were contracted for the construction of the new Western Cancer Centre Dubbo Centre (WCCD) which included a ground floor and first floor of labs, specialised equipment storage, front of...
Read More
John…
John Holland were appointed to deliver the Lismore Base Hospital North Tower Extension project building on the basis of critical learnings from the successful delivery of the previous stage of...
Read More
Richard…
The Wyong Hospital Redevelopment provides a new and expanded, contemporary, flexible healthcare facility suited to the new model of care and future healthcare needs of the local population. The Refurbishment...
Read More
BESIX…
BESIX Watpac was awarded the contract for the design finalisation and construction of the new Hornsby Ku-ring-gai Hospital stage 2. The works included full hospital fit out including operating theatres...
Read More
Multiplex…
Multiplex spent 12 months developing the project’s design, planning approvals, refining the construction methodology, construction systems, materials, and value engineering. The New Maitland Hospital is a 7-storey public health facility...
Read More
Multiplex…
Multiplex was awarded the contract for the design finalisation and construction of the new Acute Services Building. The total developed floor area is approximately 89,000m2 of gross floor area. Includes...
Read More
Fugen…
Fugen were contracted for the refurb works of the Calvery CSSD and Surgicentre. Several areas were critical for infection control and the design and construct of the mechanical ventilation, HEPA...
Read More
Erilyan…
Erilyan was contracted for the construction of a new Radiation and Medical Oncology Centre. Basement levels one and two -Construction and installation of equipment, fixtures and finishes to the Control...
Read More
Buildcorp…
St Vincent’s Public Hospital in partnership with the NSW Government completed Australia’s first Psychiatric Alcohol and Non-Prescription Drug Assessment (PANDA) unit. The project required the reconfiguration of the existing and...
Read More
Buildcorp…
The aim of the project was to refurbish and expand the existing hospital facilities and infrastructure whilst not reducing capacity at any time. The scope of the project delivery consisted...
Read More