BESIX…
BESIX Watpac was awarded the contract for the design finalisation and construction of the new Hornsby Ku-ring-gai Hospital stage 2. The works included full hospital fit out including operating theatres...
Read More
Multiplex…
Multiplex spent 12 months developing the project’s design, planning approvals, refining the construction methodology, construction systems, materials, and value engineering. The New Maitland Hospital is a 7-storey public health facility...
Read More
Multiplex…
Multiplex was awarded the contract for the design finalisation and construction of the new Acute Services Building. The total developed floor area is approximately 89,000m2 of gross floor area. Includes...
Read More
Fugen…
Fugen were contracted for the refurb works of the Calvery CSSD and Surgicentre. Several areas were critical for infection control and the design and construct of the mechanical ventilation, HEPA...
Read More
Erilyan…
Erilyan was contracted for the construction of a new Radiation and Medical Oncology Centre. Basement levels one and two -Construction and installation of equipment, fixtures and finishes to the Control...
Read More
Buildcorp…
St Vincent’s Public Hospital in partnership with the NSW Government completed Australia’s first Psychiatric Alcohol and Non-Prescription Drug Assessment (PANDA) unit. The project required the reconfiguration of the existing and...
Read More
Buildcorp…
The aim of the project was to refurbish and expand the existing hospital facilities and infrastructure whilst not reducing capacity at any time. The scope of the project delivery consisted...
Read More
Richard…
The facility consists of four levels, with three levels of bedrooms and common areas and a basement for car parking and back of house facilities including kitchen and laundry. Richard...
Read More
Stephen…
A complicated sequence of work was needed to construct this 149 bed, two level Aged Care Facility. An older, smaller facility (at a reduced capacity) was operating on the site...
Read More
Hansen…
This very large Aged Care Facility comprising 7, 3 & 4 storey buildings was completed (during covid disruptions) in the remarkably short time of 20 months. The complex comprises a...