Buildcorp… The GTP Group required a new fitout for their Offices on levels 50, 51 and 52 of the MLC Centre. This required that the noisy and heavy material work be...
Read More
Buildcorp… This Design and Construct base building contract and Construction Management fit out contract has 12,450m2 of net lettable area; the project cost $72.2 and was completed in 19 months, a...
Read More
Hansen… The Medica Centre is a private hospital; it is considered a one stop shop for all medical needs. The nine level basement car park is 27m deep, requiring 68,000m2 of...
Read More
… The Hospital is located on the grounds of the Macquarie University North Ryde Campus. The project consists of two buildings, the Hospital and Specialist Clinic buildings. The Hospital building has...
Read More
Hi-Pac… This school gymnasium is in a residential area; therefore strict acoustic requirements were called for. Externally the pre cast concrete panels achieved these requirements, but noise through the roof posed...
Read More
A W… The project is a $145 million dollars (exc GST) iconic building which was completed in 3 years with no extensions of time, minimal variations and maintaining the original design intent...
Read More
John… DEFENCE FACILITIES: This Defence Department project consists of four separate buildings spread across a 2km radius at the Blamey Barracks at Kapooka. (Wagga Wagga) The four buildings consist of: •...
Read More
… The Ausgrid Technical Learning Centre is a new construction that brings together scattered facilities into one integrated modern campus style learning facility. The project achieved a 6 Star Green Star...
Read More
Fugen… This BER project required the construction of a new three storey building with four classrooms per floor separated by operable walls. At each end of the building there is a...
Read More