Buildcorp… This project comprised the creation of a multi-floor void and feature stair together with refurbishment of the adjoining areas in the bank’s existing premises. Each level was occupied throughout the...
Read More
Built… The 20 Martin Place project consisted of a complex refurbishment of an existing 1970s commercial tower. This was stripped back to a steel skeleton and rebuilt to create a signature...
Read More
Rohrig… The well-known Crows Nest Hotel has had extensive renovations - the basement was excavated to provide a much-needed loading dock, coolrooms, grease trap, main switchboard and coolroom facilities. Shared access...
Read More
Paynter… Bankstown Sports Club has a master plan that included extending the existing four-storey hotel over the club to eight storeys. The building was originally built in the late ‘90s, with...
Read More
Icon… This project involved major alterations and additions to the existing Clare Hotel and administration building. Construction included demolition, excavation, services and high-quality fitout to 62 rooms, offices, back-of-house areas, common...
Read More
Bennett… The Elements of Byron is a new five-star resort located on Belongil Beach, Byron Bay. The resort includes restaurants, bars, extensive function facilities, pools and landscaping. The lobby and reception...
Read More
… This project is the redevelopment of the former Swiss Grand Resort Spa in Bondi. The Pacific is a mixed-use development now with 112 luxury residential apartments, a boutique hotel with...
Read More
Multiplex… Stage 1 of the 161 Sussex Street Redevelopment Project involved the refurbishment of the existing operational hotel, the connection to adjacent heritage buildings and the construction of a new 3450sqm...
Read More
Built… The newly constructed 18-storey office building on a complex CBD site, located on top of a rail corridor, is flanked on three sides by existing multi-storey structures including the Hilton...
Read More
Total… This project took place within an existing facility operating 24/7, with continual truck and pedestrian movements taking place around the work site and where dust control was critical. The works...
Read More